FOR ARCHIVE USE ONLY: HS2 Ltd Consultation Blog

This blog publicised the public consultation, which ran February to July 2011

Posts Tagged ‘Timetable

Planning and legislation

Average number of long distance trips per person per year

More information about the HS2 consultation. Planning and Legislation factsheets include:

  • Alternative Routes Considered – “Route 1.5” Via Heathrow
  • Alternative Routes Considered – “Route 2.5”
  • Alternative Routes Considered – “Route 4”
  • Arrangements for dealing with property blight
  • Connecting to Heathrow
  • Exceptional Hardship Scheme
  • Fares on Long Distance Rail and HS2 (London to West Midlands)
  • Forward Timetable
  • Future Demand for Long Distance Travel
  • Government Hybrid Bills
  • Summary of the HS2 Economic Case

Read the factsheet introduction, and access the full factsheet using the links below.

Read the rest of this entry »

Advertisements

Written by HS2 Ltd

May 18, 2011 at 10:13 am

Engineering factsheets

Released capacity on the West Coast Main LineMore information about the HS2 consultation. Engineering factsheets include:

  • Construction Timetable
  • Creating Jobs
  • HS2 Costs
  • HS2 Railway Cross-section
  • HS2 Technical Specification
  • Interoperability – International Standards for High Speed Rail
  • Maintaining a safe, reliable network
  • Powering HS2
  • Released Capacity on the Wider Rail Network
  • Roads and Rights of Way
  • Safety and Security
  • Serving the Continent
  • Telecommunications for HS2

Read the factsheet introductions, and access the full factsheets using the links below.

Read the rest of this entry »